Posted on Jul 11, 2018, 9:07 AM
Currently, Eilbeck Cranes Machining Centre is machining all bolted and pinned connections for the 280t Full Portal TBM Handling Crane. By doing this ECs are ensuring ease of assembly and installation of the crane structure, and low running and maintenance costs of the crane as all connections are…